Mo-Dot Planned Road Work for Northwest Missouri, August 30 – Sept. 5

Andrew County

Interstate 229 – Resurfacing project from Interstate 29, north of St. Joseph, to Route 371 (mile marker 14 to 3) through mid-September. A 10-foot width restriction is in place.

I-29 – Bridge replacement project northbound over Hopkins Creek (mile marker 58) through October. Traffic is head-to-head in the southbound lanes. *

U.S. Route 169 – Drainage work from Heritage Drive to County Road 305 and from County Road 3082 to County Road 308, Aug. 30

U.S. Route 71 – Utility work just north of Route T, Aug. 30 – Sept. 1

Route M – Pavement repair, Aug. 30 – Sept. 1

Route DD – Culvert work approximately 1 mile south of Savannah near County Road 366, Sept. 1

Route DD – Culvert work from Evergreen Drive to County Road 374, Sept. 2

 

Atchison County

I-29 – Bridge replacement project over Nishnabotna River (mile marker 122 – 124) through September 2022. Traffic is head-to-head in the southbound lanes. More info: https://www.modot.org/atchison-county-interstate-29-nishnabotna-river-bridge-rehabilitation *

Route 111 – Resurfacing project from Route E to Route 111 Spur (Holt County) through September. This includes intermittent CLOSURES for pavement repairs. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Routes A, BB, D, E, TT, U, V, W & Z – Resurfacing project through September. This includes intermittent CLOSURES for pavement repairs. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

U.S. Route 136 – Erosion repair project at the Missouri River Bridge to Brownville, NE through October. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route M – Pothole patching from Route C to the Iowa state line, Aug. 30

 

Buchanan County

U.S. Route 36 – Guardrail, pavement repair and resurfacing from the Missouri River to 0.75 miles east of Route AC through September. A 12-foot width restriction is in place.

I-229 – Resurfacing project from Route 371 to I-29, north of St. Joseph (mile marker 3 to 14), through mid-September. A 10-foot width restriction is in place.

I-229 – Concrete replacement from I-29 to 22nd Street through September. This includes around-the-clock lane closures.

U.S. Route 169 (Belt Highway) – Culvert repair project from Karnes Road to Floral Avenue, through September. Southbound traffic is shifted, and no left turns are permitted within the project limits.

 

Carroll County

Route Z – CLOSED until further notice from Route C to County Road 217 due to damage caused by a roadway slide and ongoing geological studies.

Route EE – CLOSED for a culvert replacement from County Road 230 to County Road 240, Aug. 31, 8 a.m. to 2:30 p.m.

Route U – Pothole patching from Route Z to U.S. Route 65, Aug. 31 – Sept. 1

 

Chariton County

Route KK – Bridge maintenance at the Little Chariton River Bridge, Aug. 30 – Sept. 3

U.S. Route 24 and Route 5 – Americans with Disabilities Act (ADA) sidewalk improvement project in Keytesville, Aug. 30 – Sept. 4

Route 129 –ADA sidewalk improvement project in Salisbury, Aug. 30 – Sept. 4

Route KK – CLOSED for a culvert replacement from Moses Hurt Avenue to Bill Bass Avenue, Sept. 1, 8 a.m. to 3 p.m.

Route KK – CLOSED for a culvert replacement from Bill Bass Avenue to Route WW, Sept. 2, 8 a.m. to 3 p.m.

Route KK – CLOSED for a culvert replacement from Route WW to Hayes Cutoff Road, Sept. 3, 8 a.m. to 3 p.m.

 

Clinton County

Route NN – Pothole patching from Route VV to Route 33, Aug. 30 – Sept. 2

 

Daviess County

Route K – Pothole patching, Aug. 30 – Sept. 2

 

Gentry County

Route N – Pavement repair, Aug. 31 – Sept. 2

 

Harrison County

U.S. Route 136 – Bridge maintenance at the bridge over I-35, Aug. 30 – Sept. 2. A 14-foot width restriction is in place.

I-35 – Intermittent lane closures under the U.S. Route 136 Bridge (Exit 92), Aug. 30 – Sept. 2. A 14-foot width restriction is in place.

 

Holt County

Route 111 – Resurfacing project from Route 111 Spur to Route E (Atchison County) through early September. This includes intermittent CLOSURES for pavement repairs. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route 118 – Bridge maintenance at the I-29 overpass, Aug. 30 – Sept. 1. There will be an around-the-clock lane closure with temporary traffic signals and a 16-foot width restriction.

Route B – CLOSED for culvert replacements from Route 113 to U.S. Route 59, Aug. 31 – Sept. 1, 6 a.m. to 3:30 p.m. daily

U.S. Route 59 – Drainage work 1 mile east of Oregon, Sept. 2

I-29 – Bridge maintenance at the bridge over Raintree Drive, mile marker 73.4, Sept. 2 – 3

 

Linn County

U.S. Route 36 – Bridge maintenance, westbound, at Big Turkey Creek Bridge, Aug. 30 – Sept. 2

 

Livingston County

Route C – Pothole patching from 1 mile west of Route F to Route Z, Aug. 30

Route 190 –ADA sidewalk improvement project in Chillicothe at Hornet Road, Aug. 30 – Sept. 4

Route Z – Pothole patching from 2 miles south of U.S. Route 65 to the Carroll County line, Aug. 31

 

Nodaway County

Route E – Culvert repair north of Route 246, Aug. 30 – 31

Route D – Pothole patching from Route KK to U.S. Route 71, Aug. 31 – Sept. 2

U.S. Route 71 – Culvert repair, northbound only, from Route U to 1 mile north of Route U, Sept. 1

 

Sullivan County

Route U – Pothole patching, Aug. 30 – Sept. 1

Route O – Pothole patching, Sept. 1 – 3