Mo-Dot Planned Road Work for Northwest Missouri, July 5 – 11

Andrew County

Interstate 229 – Resurfacing project from I-29, north of St. Joseph, to Route 371 (mile marker 14 to 3) through mid-September.

I-29 – Bridge replacement project northbound over Hopkins Creek (mile marker 58) through October. Traffic is head-to-head in the southbound lanes.*

Route DD – CLOSED for a culvert replacement from Evergreen Drive to County Road 374, July 6, 6 a.m. to 4:30 p.m.

I-29 – Bridge maintenance over Dillon Creek (mile marker 55.2), July 6 – 8. A 12-foot width restriction will be in place.

Route O – CLOSED for a culvert replacement from Route W to County Road 290, July 7, 6 a.m. to 4:30 p.m.

Route H – CLOSED for a culvert replacement from County Road 44 to County Road 46, July 8, 6 a.m. to 4:30 p.m.

 

Atchison County

I-29 – Bridge replacement project over Nishnabotna River (mile marker 122 – 124) through August 2022. Traffic is head-to-head in the southbound lanes. More info: https://www.modot.org/atchison-county-interstate-29-nishnabotna-river-bridge-rehabilitation *

Route B – Pavement repair and resurfacing project from I-29 to U.S. Route 59 near Rock Port through mid-July. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route 111 – Resurfacing project from Route E to Route 111 Spur (Holt County) through July. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route BB – CLOSED for a resurfacing project through July. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route Z – Pavement repair project through August. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

 

Buchanan County

I-229 – Resurfacing project from Route 371 to I-29, north of St. Joseph (mile marker 3 to 14), through mid-September. A 10-foot width restriction is in place.

U.S. Route 36 – Guardrail, pavement repair and resurfacing between the Missouri River and 0.75 miles east of Route AC through early August. A 12-foot width restriction is in place.

I-229 – Ramps CLOSED for a resurfacing project:

  • July 6, 6 a.m. to 7 p.m.
    • Both on- and off-ramps southbound at Highland Avenue
    • From St. Joseph Avenue to southbound I-229
  • July 7, 6 a.m. to 7 p.m.
    • Both on- and off-ramps southbound at eastbound U.S. Route 36/Route 759
    • Both on- and off-ramps southbound at Highland Avenue
    • From St. Joseph Avenue to southbound I-229
  • July 8, 6 a.m. to 7 p.m.
    • Both on- and off-ramps southbound at eastbound U.S. Route 36/Route 759

Route 371 (22nd Street) – CLOSED for bridge maintenance over U.S. Route 36, July 8 – 23. This is an around-the-clock closure. All ramps at the bridge remain open.

 

Caldwell County

U.S. Route 36 – Resurfacing and pavement repair through Caldwell, Livingston and Linn counties through July. There will be intermittent lane closures with a 14-foot width restriction.

 

Carroll County

Route Z – CLOSED until further notice from Route C to County Road 217 due to damage caused by a roadway slide and ongoing geological studies.

 

Chariton County

Route 139 – CLOSED for a bridge replacement project at the Grand River Overflow Bridge through mid-July. More info: https://www.modot.org/chariton-county-route-139-grand-river-overflow-bridge *

 

Clinton County

I-35 – Pavement repair project from Route 116 to Shoal Creek through early July. There will be intermittent lane closures with a 10-foot width restriction.

 

Daviess County

Route K – Pothole patching from Route B to Route 146 (Harrison County), July 6 – 7

Route V – CLOSED from Otter Avenue to Prairie Avenue, July 7, 7 a.m. to 2:30 p.m.

 

DeKalb County

U.S. Route 36 – Pavement repair, guardrail improvements, and resurfacing westbound from east of Route 31 to Route C and eastbound from Route 33 to the Grindstone River through July. A 12-foot width restriction is in place.

Routes D, E & H – Pothole patching, July 6 – 9

 

Gentry County

U.S. Route 169 – CLOSED for a bridge deck replacement project over Middle Fork of the Grand River, near Gentry, through August. More info: https://www.modot.org/route-169-and-route-ee-bridge-deck-replacement *

 

Grundy County

Route B – CLOSED for bridge maintenance at the Muddy Creek Bridge, east of Spickard, July 6, 7 a.m. to 3:30 p.m.

Route 139 – Sealing operation from Route 6 to U.S. Route 136 (Putnam County), July 6 – 9. A 15-foot width restriction is in place.

 

Harrison County

Route P – CLOSED for a bridge replacement project over White Oak Creek through mid-July. More info: https://www.modot.org/harrison-county-route-p-over-white-oak-creek *

Route ZZ – CLOSED for a culvert replacement from Route P to West 367th Place, July 6, 7 a.m. to 3 p.m.

Route K – Pothole patching from Route B (Daviess County) to Route 146, July 6 – 7

Route Y – Pothole patching, July 6 – 9

Route NN – CLOSED for a culvert replacement from Route M to County Road 180, July 7, 8 a.m. to 3 p.m.

Route ZZ – CLOSED for a culvert replacement from West 367th Place to West 385th Street, July 7, 7 a.m. to 3 p.m.

Route ZZ – Drainage work from Route T to West 115th Avenue, July 7 – 9

 

Holt County

Route B – CLOSED for a bridge deck replacement project over I-29 near Oregon through mid-July. More info: https://www.modot.org/holt-county-route-b-bridge-deck-replacement-over-i-29 *

I-29 – Intermittent lane closures, both directions, between Exits 67 and 75, as part of a bridge deck replacement project on Route B, near Oregon, through early July. A 12-foot width restriction is in place.

Route 111 – Resurfacing project from Route 111 Spur to Route E (Atchison County) through July. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

 

Linn County

U.S. Route 36 – Resurfacing and pavement repair through Caldwell, Livingston and Linn counties through July. There will be intermittent lane closures with a 14-foot width restriction.

Route 130 – Pothole patching from Route YY to U.S. Route 36, July 6 – 8

Route YY – Pothole patching from Route 139 to Route 130, July 6 – 8

 

Livingston County

U.S. Route 36 – Resurfacing and pavement repair through Caldwell, Livingston and Linn counties through July. There will be intermittent lane closures with a 14-foot width restriction.

 

Nodaway County

U.S. Route 71 – Intersection improvement project at Icon Road through early July. A 12-foot width restriction is in place.

Icon Road – CLOSED at the intersection of U.S. Route 71 for an intersection improvement project through early July.

Route NN – CLOSED for pavement repairs from Route 46 to Orion Road, July 6 – 7, 7a.m. to 5:30 p.m. daily

Route TT – CLOSED for a resurfacing project, July 6 – 7, 7 a.m. to 5 p.m. daily

Route B – CLOSED for pavement repairs from Route AD to Route FF, July 8, 6:30 a.m. to 4:30 p.m.

Route V – CLOSED for a resurfacing project, July 8 – 9, 7 a.m. to 5 p.m. daily

 

Putnam County

Route 139 – Sealing operation from Route 6 (Grundy County) to U.S. Route 136, July 6 – 9. A 15-foot width restriction is in place.

 

Worth County

Route Z – Drainage work 1 mile south of Route 46, July 6