Mo-Dot Planned Road Work For Northwest Missouri, July 12-18

 

Andrew County

Interstate 229 – Resurfacing project from I-29, north of St. Joseph, to Route 371 (mile marker 14 to 3) through mid-September.

I-29 – Bridge replacement project northbound over Hopkins Creek (mile marker 58) through October. Traffic is head-to-head in the southbound lanes.*

Route DD – CLOSED for a culvert replacement from County Road 366 to County Road 369, July 12, 6 a.m. to 4:30 p.m.

I-29 – Bridge maintenance at the north and southbound bridges over Route DD, July 12 – 15

Route D – CLOSED for a culvert replacement from County Road 185 to County Road 324, July 13, 6 a.m. to 4:30 p.m.

Route C – CLOSED for a culvert replacement from County Road 187 to County Road 182, July 14, 6 a.m. to 4:30 p.m.

Business 71 – Shoulder work from County Road 344 north 0.5 miles, July 15, 6 a.m. to 4:30 p.m.

 

Atchison County

I-29 – Bridge replacement project over Nishnabotna River (mile marker 122 – 124) through August 2022. Traffic is head-to-head in the southbound lanes. More info: https://www.modot.org/atchison-county-interstate-29-nishnabotna-river-bridge-rehabilitation *

Route B – Pavement repair and resurfacing project from I-29 to U.S. Route 59 near Rock Port through mid-July. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route 111 – Resurfacing project from Route E to Route 111 Spur (Holt County) through July. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route BB – CLOSED for a resurfacing project through July. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route Z – Pavement repair project through August. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

Route 111 – CLOSED for ditching from Route E to Route Z, July 12 – 14, 7 a.m. to 2 p.m. daily

 

Buchanan County

I-229 – Resurfacing project from Route 371 to I-29, north of St. Joseph (mile marker 3 to 14), through mid-September. A 10-foot width restriction is in place.

U.S. Route 36 – Guardrail, pavement repair and resurfacing between the Missouri River and 0.75 miles east of Route AC through early August. A 12-foot width restriction is in place.

Route 371 (22nd Street) – CLOSED for bridge maintenance over U.S. Route 36, July 12 – 23. This is an around-the-clock closure. All ramps at the bridge remain open.

I-229 – Concrete replacement north and southbound from 22nd Street to I-29, through mid-August. A 12-foot width restriction is in place.

Route 752 (Mason Road) – Shoulder work from 22nd Street to 14th Street, July 15

 

Caldwell County

U.S. Route 36 – Resurfacing and pavement repair through Caldwell, Livingston and Linn counties through mid-July. There will be intermittent lane closures with a 14-foot width restriction.

Route A – CLOSED for a culvert replacement from U.S. Route 36 to Wolf Grove Drive, July 12, 8 a.m. to 3 p.m.

 

Carroll County

Route Z – CLOSED until further notice from Route C to County Road 217 due to damage caused by a roadway slide and ongoing geological studies.

 

Chariton County

Route 139 – CLOSED for a bridge replacement project at the Grand River Overflow Bridge through mid-July. More info: https://www.modot.org/chariton-county-route-139-grand-river-overflow-bridge *

Route P – CLOSED for a culvert replacement from Puzzle Lane to Falcon Lane, July 12, 8 a.m. to 2 p.m.

Route DD – CLOSED for culvert replacements from 7 a.m. to 3 p.m. as follows:

  • July 12 – from Route D to Hamden Road
  • July 13 – from Knox Road to Lake Road
  • July 14 – from Almond Avenue to Thomas Avenue
  • July 15 and 16 – from Heath Lane to Blacksmith Avenue

Route 11 – Bridge maintenance at the Salt Creek Bridge, July 12 – 13. Temporary traffic signals will be in place.

Route 5 – Bridge maintenance at the Cottonwood Creek Bridge, July 13 – 15. Temporary traffic signals will be in place.

Route KK – Bridge maintenance at the Little Chariton River Bridge, July 15 – 16. Temporary traffic signals will be in place.

 

Daviess County

Route F – CLOSED for culvert repairs from South Elm Street to West Charles Street in Jamesport, July 12, 6 a.m. to 2:30 p.m.

Route Y – CLOSED for a culvert replacement from Route 6 to Reel Avenue, July 14, 6 a.m. to 2:30 p.m.

 

DeKalb County

U.S. Route 36 – Pavement repair, guardrail improvements, and resurfacing westbound from east of Route 31 to Route C and eastbound from Route 33 to the Grindstone River through July. A 12-foot width restriction is in place.

Route 6 – Culvert replacement at Hedge Road entrance, July 13

U.S. Route 69 – Culvert replacement at Vow Road entrance, July 14

 

Gentry County

U.S. Route 169 – CLOSED for a bridge deck replacement project over Middle Fork of the Grand River, near Gentry, through August. More info: https://www.modot.org/route-169-and-route-ee-bridge-deck-replacement *

Route ZZ – Ditching from Route T to 400 Street, June 13 – 15

 

Harrison County

Route P – CLOSED for a bridge replacement project over White Oak Creek through mid-July. More info: https://www.modot.org/harrison-county-route-p-over-white-oak-creek *

Route ZZ – CLOSED for a culvert replacement from 375 Place to 385 Street, July 12, 7 a.m. to 4 p.m.

 

Holt County

Route B – CLOSED for a bridge deck replacement project over I-29 near Oregon through July 16. More info: https://www.modot.org/holt-county-route-b-bridge-deck-replacement-over-i-29 *

I-29 – Intermittent lane closures, both directions, between Exits 67 and 75, as part of a bridge deck replacement project on Route B, near Oregon, through July 16. A 12-foot width restriction is in place.

Route 111 – Resurfacing project from Route 111 Spur to Route E (Atchison County) through July. More info: https://www.modot.org/atchison-and-holt-county-flood-damage-repairs

 

Linn County

U.S. Route 36 – Resurfacing and pavement repair through Caldwell, Livingston and Linn counties through mid-July. There will be intermittent lane closures with a 14-foot width restriction.

Route BB – Pothole patching from Route B to Route KK, July 14

 

Livingston County

U.S. Route 36 – Resurfacing and pavement repair through Caldwell, Livingston and Linn counties through mid-July. There will be intermittent lane closures with a 14-foot width restriction.

Route B – Pothole patching from U.S. Route 36 to Route BB, July 12 – 13

Route KK – Pothole patching from Route BB to Route K, July 15

 

Nodaway County

U.S. Route 71 – Northwest Missouri State University intersection improvement project at Icon Road through July. A 12-foot width restriction is in place.

Icon Road – CLOSED at the intersection of U.S. Route 71 for Northwest Missouri State University’s intersection improvement project through July.

Routes V –Resurfacing, July 12

Route B – CLOSED for pavement repairs from Route AD to Route FF, July 12 – 14, 6:30 a.m. to 4:30 p.m. daily

Route KK – CLOSED for pavement repairs from Canyon Road to Route D, July 15, 6:30 a.m. to 4:30 p.m.

Routes AF, AC & V – Pothole patching, July 12 – 16

 

Putnam County

Route 139 – Sealing operation from Route 6 (Grundy County) to U.S. Route 136, July 6 – 9. A 15-foot width restriction is in place.

 

Worth County

Route N – CLOSED for a culvert replacement from Route M to County Road 220, July 12, 7 a.m. to 4 p.m.

Route N – CLOSED for a culvert replacement from Route M to County Road 232, July 13 – 14, 7 a.m. to 4 p.m. daily

  • Indicates a bridge is included in Gov. Mike Parson’s $351 million Focus on Bridges program, which will repair or replace 250 bridges across the state.